Skip to content

Building an addition in Lyndeborough NH

by Allen on March 18th, 2012

Here are before and during pictures of an addition we are building for a customer in Lyndeborough NH. Thankfully due to the mild winter we are currently having this year Keith was able to have our Excavator, Ken Rocca, dig a 20×30 hole in the ground and not have to worry about frost (since there was none). We then had Jeff Creighton of JC Foundations come in and set forms for the foundation and last but not least Gary Senecal of Milford NH poured the cement pad for our basement. Everyone pulled together and we had the entire foundation ready in just two weeks. A plan always comes together when you hire some of the best sub-contactors in Southern NH.
This is going to be a great project to document as we are building a two story addition to include a master bedroom and bathroom, dining room and living room. I am excited to see how Keith will build the new roof line in conjunction with the existing old farmhouse roof. There was some challenging times when the foundation was going in because the existing farmhouse had a rock foundation and Keith needed to make sure that the new addition was properly secured to the new cement foundation, a lot of engineering and everything synched up perfectly. Next week I will have pictures to show of the second story and the new roof line, very exciting!

From → Uncategorized

No comments yet

Leave a Reply

Note: XHTML is allowed. Your email address will never be published.

Subscribe to this comment feed via RSS