Dormer

Ok, the triple, awning window has arrived from Harvey Industries. We installed the window on Monday and installed the siding right up to the window to finalize the outside. On Tuesday, the inspector passed our framing inspection and we were able to insulate and hang the drywall. We are also installing a chair-rail and wainscoting on the entire lower half of the bathroom addition. I think we have another 2 weeks to finish up the trim work, painting, flooring and finish plumbing and electric. The Homeowner is excited to have the bathroom finished and workable.